Brisbane Airport is undergoing its $5 billion Future BNE transformation - a landmark infrastructure program preparing Queensland’s primary international gateway for the 2032 Olympic and Paralympic Games.

​

Delivering major structural and systems upgrades within a high-security, 24/7 live aviation hub presented significant design and safety challenges. Construction staging, barrier protection, heavy vehicle deliveries, and scaffolding installations had to be executed across both busy landside roadways and sensitive airside zones - all without disrupting continuous passenger flows, emergency access, or strict aviation safety protocols.

​

SITE Traffic Engineering was engaged to provide end-to-end traffic engineering, safety barrier design, and temporary traffic management solutions across multiple stages of the terminal upgrades. Working in close collaboration with the head contractor Lendlease, traffic and site services partner Dowells Group, and access specialists Cava Scaffold Solutions, our team ensured seamless coordination from design through to on-site verifications covering:

​

  • Engineered numerous bespoke road safety barrier layouts for both high-volume landside terminal roadways and sensitive airside environments, protecting active work zones, pedestrians, and critical aviation infrastructure.

​​

  • Developed comprehensive Construction Traffic Management Plans (CTMPs) and Traffic Guidance Schemes (TGS) to support Lendlease’s terminal security, mezzanine, and baggage system works while keeping live terminal roadways and airside services moving smoothly and safely.

​​

  • Partnered directly with Dowells Group to bridge the gap between engineered traffic designs and practical on-site delivery, supporting complex lane closures, pedestrian diversions, and off-peak night works.

​​

  • Conducted detailed swept path analyses and designed dedicated work zones to safely facilitate Cava Scaffold Solutions’ structural access installations and material deliveries in constrained terminal environments.

​​

  • Carried out rigorous on-site field audits to inspect, verify, and certify the correct installation of traffic management and road safety barrier systems, providing RPEQ and TMD sign-off in full compliance with Brisbane Airport Corporation (BAC) standards.

 

Through proactive staging, compliant barrier engineering, and thorough on-site auditing, SITE Traffic Engineering helped maintain safe, uninterrupted landside and airside operations throughout complex, multi-phase construction - demonstrating our capability to deliver high-stakes traffic engineering solutions in one of Queensland’s most sensitive and busiest transport environments.

bne2.jpg
bne5.jpg
bne6.jpg
80470 Design A-80470 - 201 WB.jpg
Key Stakeholders
bne airport logo_edited.jpg
bne_edited.jpg
lendlease.png

Copyright © 2026 | All Rights Reserved

​

SITE Traffic Engineering Pty Ltd | ABN 46 695 860 934

bottom of page